Thanh Phuoc Port

Function:
Transport – Port: Port and port warehouse area
Construction grade:
Grade III
Time - Location:
2025 · Thanh Phuoc Port, Go Dau Ward, Tay Ninh
Gross floor area (GFA):
—
Total investment:
—
Investor:
VRG Thanh Phước

KTEST's role

Thanh Phuoc Port

Problem

Go Dau Ward People's Committee does not meet the conditions for appraisal (Document No. 293/UBND-KT of 26 Feb 2026). The Department of Construction assessed that lowering the site-levelling elevation of the TMND Zone and the Port Warehouse Zone has a major impact on technical infrastructure, forcing a change from a partial to an overall adjustment (Document No. 3194/SXD-QHPTĐT of 2 Apr 2026).

Solution

Prepare review report (BCRS) to DoC for Provincial PC policy approval of overall adjustment; then NVQH planning task and overall adjustment plan. BCRS & NVQH variation quote: 01/06/2026.

Result

Community consultation completed (Document No. 786/UBND-KTHT&ĐT of 4 May 2026). Document No. 9648/SXD-QHPTĐT of 6 Aug 2026 on the adjustment of the site-levelling elevation.

Project overview

According to the updated report dated November 5, 2026, the project owner is VRG Thanh Phuoc Joint Stock Company, whereas the original contract was signed with Thuan Hai Commodities. The comprehensive standardization of technical and legal documentation not only enables Thanh Phuoc Port to overcome infrastructure planning constraints but also ensures sustainable operational capabilities and maximizes the region's logistics potential in Tay Ninh Province. Furthermore, it reinforces a long-term strategic vision of driving economic development in the border trade region and strengthening international trade connectivity. Moreover, the comprehensive revision of the master plan and the resolution of outstanding issues related to site grading elevations establish a solid legal foundation for attracting investment capital and expanding the port's operational scale.