
Megmilk Factory
- Function:
- Industrial building
- Construction grade:
- Grade III
- Time - Location:
- 2024 · Tay Ninh (PAT)
- Gross floor area (GFA):
- 3,800.3 m²
- Total investment:
- VND 138 billion
- Investor:
- MEGMILK SNOW BRAND
KTEST's role

Nanoco Head OfficeHCMC2017NanocoNanoco Office Tran NaoHCMC2026NANOCOMidori ParkHCMC2025Becamex TokyuAeonmall Binh DuongBinh Duong2014AEONAeon Mall Tan PhuHCMC2012AEONAeonmall Binh TanHCMC2015AEONDeutsches HausHCMC2022Deutsches HausSaigon Centre Phase 2Tp.HCM2026Keppel Land Watco II & IIISaigon CentreHCMC2017KEPPEL LANDSC VivoCityHCMC2014MapletreeThe AscentHCMC2016CEL DevelopmentWink Can ThoCan Tho2022Indochina Capital
Free consultation
Construction investment project procedures checklist
A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.