Kumho Tyre Factory

Function:
Factory
Construction grade:
Grade I
Time - Location:
2022 · HCMC
Gross floor area (GFA):
35,352 m²
Total investment:
VND 5,573.2 billion
Investor:
KUMHO TIRE

KTEST's role

Kumho Tyre Factory

Result

Construction Permit No. 60/GPXD of 2023 from the Binh Duong Industrial Parks Management Board (Grade I industrial works).

Project overview

Located in My Phuoc III Industrial Park, Thoi Hoa Ward, Ho Chi Minh City, the Kumho Automotive Tire Manufacturing Plant – Phase 2, developed by Kumho Tire Vietnam Co., Ltd. (Kumho Tire Group, South Korea), is a major expansion project in the automotive industry. Commencing construction in 2021–2022, the facility was completed and officially put into operation in 2023–2024, raising the plant’s total capacity to over 12.5 million tires annually. Equipped with synchronized automated production lines and advanced international-standard manufacturing technologies, the plant specializes in producing high-quality automotive tires for both the domestic market and global export.

Free consultation

Construction investment project procedures checklist

A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.