Thu Thiem Lake View3
- Function:
- Mixed-use complex
- Construction grade:
- Grade I
- Time - Location:
- 2025 · HCMC (An Khanh)
- Gross floor area (GFA):
- 26,627 m²
- Total investment:
- Private
- Investor:
- Khu Bắc Thủ Thiêm
KTEST's role

Project overview
GPXD 440/GPXD-BQL-XD (29/05/2020): blocks A-D, 5&10 fl., 1 basement; 40.94 m; land 9,473.8 m²; GFA excl. basement 18,000 m². TB 226/HĐXD-QLDA (10/08/2022): adj. FS appraised; GPXD adj. 47923/SXD-QLXDCT (22/08/2025)
Image source: icpproject.com.vn
Nanoco Head OfficeHCMC2017NanocoNanoco Office Tran NaoHCMC2026NANOCOMidori ParkHCMC2025Becamex TokyuAeonmall Binh DuongBinh Duong2014AEONAeon Mall Tan PhuHCMC2012AEONAeonmall Binh TanHCMC2015AEONDeutsches HausHCMC2022Deutsches HausSaigon Centre Phase 2Tp.HCM2026Keppel Land Watco II & IIISaigon CentreHCMC2017KEPPEL LANDThe AscentHCMC2016CEL DevelopmentWink Can ThoCan Tho2022Indochina CapitalCeladon CityHCMC2013GAMUDA LAND
Free consultation
Construction investment project procedures checklist
A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.