Yuwa Factory 1

Function:
Factory
Construction grade:
Grade IV
Time - Location:
2021 · HCMC (BD)
Gross floor area (GFA):
Private
Total investment:
Private
Investor:
Yuwa Việt Nam

KTEST's role

Free consultation

Construction investment project procedures checklist

A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.