Suntory PepsiCo Long An – Feasibility Study Report Appraisal for the Boiler House; Construction Permit Adjustment
- Function:
- Industrial: Factory; total construction area of main works 78,752.31 m²
- Construction grade:
- Grade I
- Time - Location:
- 2024 · Industrial Park in Long An (former Long An), Tay Ninh
- Gross floor area (GFA):
- —
- Total investment:
- —
- Investor:
- Suntory PepsiCo Việt Nam
KTEST's role

Result
Construction Permit No. 474/GPXD (12 Mar 2024); adjusted Construction Permit No. 1461/GP-BQLKKT (30 May 2025).
Project overview
Image source: tuoitre.vn
Nanoco Office Tran NaoHCMC2026NanocoMidori ParkHCMC2025Becamex TokyuAeonmall Binh DuongBinh Duong2014AEONAeon Mall Tan PhuHCMC2012AEONAeonmall Binh TanHCMC2015AEONDeutsches HausHCMC2022Deutsches HausSaigon Centre Phase 2Tp.HCM2026Keppel Land Watco II & IIISaigon CentreHCMC2017Keppel LandSC VivoCityHCMC2014MapletreeWink Can ThoCan Tho2022Indochina CapitalThanh Phuoc PortThanh Phuoc Port, Go Dau Ward, Tay Ninh2025Công ty CP Cảng và Dịch vụ Logistics VRG Thanh PhướcTechtronic Tools VietnamHCMC2021TTI
Free consultation
Construction investment project procedures checklist
A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.