Nhat Ha 4-Star Hotel – Phase 1

Function:
Civil: 19-storey hotel + 1 basement, height 75 m, building footprint 661 m²
Construction grade:
Grade II
Time - Location:
2022 · Hai Phong
Gross floor area (GFA):
15,131.5 m²
Total investment:
—
Investor:
Nhật Hạ

KTEST's role

Free consultation

Construction investment project procedures checklist

A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.