Wink Hotel Tuy Hoa
- Function:
- Hotel
- Construction grade:
- Grade 2
- Time - Location:
- 2020 · Dak Lak (Phu Yen)
- Gross floor area (GFA):
- 103,000 m²
- Total investment:
- VND 269.76 billion
- Investor:
- —
KTEST's role

Nanoco Office Tran NaoHCMC2026NANOCOAeonmall Binh DuongBinh Duong2014AEONV PlazaHCMC2021MampletreeGS Metrocity Nha BeHCMC2021GSDeutsches HausHCMC2022Deutsches HausSaigon Centre Phase 2Tp.HCM2026Keppel LandThe Golden StarHCMC2016Hưng Lộc PhátWink Can ThoCan Tho2022Indochina CapitalOneHub SaigonHCMC2019AscendasCity GardenHCMC2018REFICOThanh Phuoc PortTay Ninh (Go Dau)2025VRG Thanh PhướcHo Tram Casino ExpansionHCMC (Ho Tram)2025Dự án Hồ Tràm
Free consultation
Construction investment project procedures checklist
A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.